1.19.2011

my agenda

Concrete : Research

A) Fenestration
       1. Punched Openings
            - Precast
            - Framing system
            - Poured in place
                  > Form work
       2. Floor to ceiling
            - Precast
            - Framing System
            - Poured in place
       3. Roof

B) Insulation
       1. Concrete
            - Window framing
            - Wall
            - Roof
            - Floor
       2. Glass
            - Framing
            - Panes/ Airspace

Concrete : Warming Hut

Should be:

- Visible from the top of the mountain
- Large enough for 16 people with gear
- Usable in all seasons
- Easily accessable
- Warm/cosy
- A shelter from the elements
- Connected to the landscape

Should not be:

- Foreign to the landscape
- Overly spacious
- In the way of skiers
- Hard to maintain

No comments:

Post a Comment